Work in progress IARPG-OPS-2 2.0.24-wip

Global publication search

Search the operations design system

Type to search standards, missions, roles, authorities, reports, sources, pages, schemas, and UAI memory.

Africa · exact audit cutoff 2026-07-23T10:53:59Z

Senegal
evidence audit

A claim-level, model-generated public-source audit of a preserved 2.0.22 draft proposal. It records evidence support, qualification, correction, and unanswered review questions. It is not independent human review, locally informed consultation, consent, exhaustive factual truth, legal determination, public-opinion measurement, geopolitical-neutrality certification, or approval for publication.

Direct answer

What does this audit establish?

It establishes that the twelve original statements were re-opened against public sources to a new exact cutoff and that every claim now has a disposition, evidence record, contradiction-search result, rationale, confidence, resolution test, human-review question, and locally informed prompt. It does not establish independent review, consultation, consent, legal validity, local acceptance, geopolitical neutrality, or approval to publish.

Machine audit
Open JSON record
Audit sources
Open source register
Local review
Unanswered packet
Original proposal
Immutable 2.0.22 input

Separation of duties

Source checked.
Not independently approved.

The model performed a bounded public-source pass. Human materiality and locally informed interpretation remain open.

DE

Deterministic Repository Checks

Schema validity, path integrity, stable identifiers, counts, six-lens coverage, reciprocal links, manifest mappings, route availability, equal review burden, and prohibited-content checks.

performed

Does not establish: Factual truth, legal validity, source interpretation, human comprehension, local acceptance, or publication approval.

SO

Source Verification Checks

Re-opened or newly collected public sources current to the exact audit cutoff; recorded support, qualification, correction, disagreement search, source language, scope, and confidence claim by claim.

performed-with-limitations

Does not establish: Independent human review, exhaustive source discovery, consultation, consent, geopolitical neutrality, or locally informed acceptance.

IN

Independent Human Judgment

Independent evaluation of materiality, legal interpretation, evidentiary sufficiency, wording neutrality, and publication fitness.

not-performed

Does not establish: Named reviewer, qualifications or relevant experience, date, methods, conflicts, claim-level decisions, and attributable review record.

LO

Locally Informed Review

Review by people with relevant local, linguistic, institutional, professional, or affected-community knowledge, with consent and publication scope recorded.

not-performed

Does not establish: Attributable or consented anonymous reviewer record, language competence, relationship to the jurisdiction or affected institution/community, conflicts, claim-level responses, and permission boundaries.

60

Claim-level audit

Original statement preserved.
Disposition appended.

01

Authority, implementation, oversight, remedy, and legitimacy

claim-senegal-01CORROBORATED
ORIGINAL 2.0.22

The Presidency identifies Bassirou Diomaye Faye as President of the Republic and records that he assumed office on 2 April 2024.

AUDIT RESULT

Original bounded statement retained.

Change: Renewed public-source access continued to support the bounded original statement at the audit cutoff; no material contradiction or supersession was located in this pass.

Rationale: The original source or a current authoritative route remained available and supported the claim within its stated institutional, geographic, and temporal scope.

Confidence: high

Resolution test: An independent reviewer should re-open the cited source, test the statement against any later correction or superseding instrument, and verify that no broader inference has been added beyond the source scope.

Inspect 1 evidence item

Biography of the President

Presidency of the Republic of Senegal · reverified-original-source

Publication
not displayed
Access
2026-07-23T10:53:59Z
Language
English
Translation
No translation; source reviewed in English.
Perspective
official-self-report
Scope
Presidency · national

Support boundary: Supports only the bounded institutional observation stated here.

Independent human question: For claim-senegal-01: Is the renewed source support sufficient for the exact bounded wording, and is any legally or politically material qualification missing?

Locally informed prompt: For a reviewer with relevant Senegal knowledge: does the wording for claim-senegal-01 match locally used institutional and public terminology for current institutions; what implementation, access, disagreement, affected-community, island/region, language, or remedy evidence is missing; and may the response be quoted, summarized, or retained only privately?

Response state: not performed / not collected.

claim-senegal-02CORRECTION REQUIRED
ORIGINAL 2.0.22

The Presidency's 1 June 2026 government-composition notice identifies Ahmadou Al Aminou Lo as Prime Minister and lists the new government under decrees issued in late May and early June 2026.

AUDIT RESULT

Official Presidency records identify Ahmadou Alhaminou Mohamed LO as Prime Minister, appointed by decree no. 2026-1129 of 25 May 2026; the 1 June 2026 cabinet notice lists the government under decree no. 2026-1130.

Change: Normalize the officeholder's name to the current official Presidency spelling and retain the decree dates separately.

Rationale: The current official profile uses 'Ahmadou Alhaminou Mohamed LO', while the 2.0.22 proposal used 'Ahmadou Al Aminou Lo'. Name precision is material for identity and source matching even though the officeholder observation remains substantively supported.

Confidence: high

Resolution test: An independent reviewer should compare the appointment decree, cabinet decree, official biography, and any official gazette rendering and adopt the exact legally published name while retaining alternate spellings as search aliases only.

Inspect 2 evidence items

Composition du nouveau Gouvernement

Presidency of the Republic of Senegal · reverified-original-source

Publication
2026-06-01
Access
2026-07-23T10:53:59Z
Language
French
Translation
Official French page reviewed with machine-assisted English translation; names, decree numbers, and dates retained verbatim; locally informed review pending.
Perspective
official-self-report
Scope
Presidency and government · national

Support boundary: Supports only the bounded institutional observation stated here.

Profil du nouveau Premier Ministre de la République du Sénégal

Presidency of the Republic of Senegal · corrects-name-and-corroborates-office

Publication
2026-05-25
Access
2026-07-23T10:53:59Z
Language
French
Translation
Official French page reviewed with machine-assisted English translation; names, dates, and decree references retained verbatim; human French-language review pending.
Perspective
official-self-report
Scope
Presidency and Prime Minister · national

Support boundary: Directly identifies Ahmadou Alhaminou Mohamed LO and states that he was appointed Prime Minister.

Independent human question: For claim-senegal-02: Does the proposed correction resolve the material error while preserving the original record and all relevant disagreement?

Locally informed prompt: For a reviewer with relevant Senegal knowledge: does the wording for claim-senegal-02 match locally used institutional and public terminology for practical authority; what implementation, access, disagreement, affected-community, island/region, language, or remedy evidence is missing; and may the response be quoted, summarized, or retained only privately?

Response state: not performed / not collected.

02

Domestic coalitions, disagreement, continuity, and change

claim-senegal-03CORROBORATED WITH QUALIFICATION
ORIGINAL 2.0.22

Ousmane Sonko was elected President of the National Assembly on 26 May 2026, creating a distinct parliamentary officeholder from the President and Prime Minister.

AUDIT RESULT

Current external reporting identifies Ousmane Sonko as elected President of the National Assembly on 26 May 2026; the audit did not locate a comparably accessible current Assembly notice, so the officeholder statement remains source-verified but awaits direct parliamentary confirmation.

Change: Retain the officeholder change while exposing the absence of a direct current parliamentary notice in the audit record.

Rationale: Multiple current reports converge, but a formal Assembly source would better establish the institutional record and exact vote procedure.

Confidence: moderate

Resolution test: Locate and review the National Assembly journal, official results notice, or authenticated sitting record for 26 May 2026 and compare the office title, vote count, and effective date.

Inspect 1 evidence item

Senegal's Sonko elected parliament speaker

Reuters · reverified-original-source

Publication
2026-05-26
Access
2026-07-23T10:53:59Z
Language
English
Translation
No translation; source reviewed in English.
Perspective
external
Scope
National Assembly · national

Support boundary: Supports the officeholder change; it is not evidence of unanimous legislative support or public opinion.

Independent human question: For claim-senegal-03: Does the qualification accurately capture the source limitation without understating or overstating the underlying institution, disagreement, or implementation gap?

Locally informed prompt: For a reviewer with relevant Senegal knowledge: does the wording for claim-senegal-03 match locally used institutional and public terminology for current institutions; what implementation, access, disagreement, affected-community, island/region, language, or remedy evidence is missing; and may the response be quoted, summarized, or retained only privately?

Response state: not performed / not collected.

claim-senegal-04CORRECTION REQUIRED
ORIGINAL 2.0.22

Reuters reported on 1 June 2026 that PASTEF said it would not participate in the newly announced government; this is recorded as a party position at that date, not as a proxy for public opinion.

AUDIT RESULT

PASTEF leader Ousmane Sonko stated on 1 June 2026 that the party would not participate in or be represented by ministers in the new government. Reuters and Al Jazeera reported that the announced cabinet nevertheless included several people identified as PASTEF members. The statement is therefore retained only as a party position and must not be treated as a verified description of cabinet affiliation.

Change: Separate the party's stated position from reported cabinet membership and preserve the contradiction explicitly.

Rationale: The original wording correctly labeled the statement as a party position, but the same-day cabinet reporting creates a material discrepancy that must be visible wherever the claim is reused.

Confidence: high

Resolution test: Obtain PASTEF's attributable statement, official party membership or minister affiliation records, and cabinet biographies; document whether named ministers were party members, independent appointees, suspended members, or described differently by the party at the cutoff.

Inspect 4 evidence items

Senegal ruling party stays out of new government

Reuters · reverified-original-source

Publication
2026-06-01
Access
2026-07-23T10:53:59Z
Language
English
Translation
No translation; source reviewed in English.
Perspective
external
Scope
Political party and executive · national

Support boundary: Supports a reported party position at the cutoff; does not establish motives, durable coalition structure, or population-wide opinion.

Senegal's Sonko pulls his party from new government, raising risk to IMF deal

Reuters · qualifies-and-identifies-discrepancy

Publication
2026-06-01
Access
2026-07-23T10:53:59Z
Language
English
Translation
No translation for the article; quoted French-language political statement remains mediated by the publisher's translation and requires original-statement review.
Perspective
external-with-local-reporting
Scope
Political party and cabinet · national

Support boundary: Reports the party non-participation statement and separately reports that the cabinet included at least three people identified as PASTEF members.

Sénégal : PASTEF claque la porte et refuse toute participation au gouvernement

Ledjely.com · corroborates-party-position

Publication
2026-06-01
Access
2026-07-23T10:53:59Z
Language
French
Translation
French source reviewed with machine-assisted English translation; quoted wording retained in the source language for later human review.
Perspective
regional-francophone-media
Scope
Political party · Senegal and West African regional readership

Support boundary: Reports the party's stated refusal to participate or be represented in the new government.

Senegal president names government, boycotted by ally-turned-rival

Al Jazeera · qualifies-party-position

Publication
2026-06-02
Access
2026-07-23T10:53:59Z
Language
English
Translation
No translation for the article; underlying political statements remain publisher-mediated.
Perspective
external
Scope
Political party and cabinet · national

Support boundary: Reports both the party position and the presence of several people identified as PASTEF members in the cabinet.

Independent human question: For claim-senegal-04: Does the proposed correction resolve the material error while preserving the original record and all relevant disagreement?

Locally informed prompt: For a reviewer with relevant Senegal knowledge: does the wording for claim-senegal-04 match locally used institutional and public terminology for source disagreements; what implementation, access, disagreement, affected-community, island/region, language, or remedy evidence is missing; and may the response be quoted, summarized, or retained only privately?

Response state: not performed / not collected.

03

Regional organizations, overlapping memberships, and agency

claim-senegal-05CORROBORATED WITH QUALIFICATION
ORIGINAL 2.0.22

ECOWAS lists Senegal among its member states.

AUDIT RESULT

The ECOWAS member-state page lists Senegal as a member. The page's surrounding membership count is internally inconsistent, so the country listing is retained while the aggregate count is not reused.

Change: Preserve the direct country listing and quarantine an unrelated count inconsistency on the source page.

Rationale: The membership observation is directly supported; the source page's count inconsistency affects source quality but not Senegal's named listing.

Confidence: high

Resolution test: Compare the current ECOWAS treaty/depositary or official member roster with the public webpage and record any withdrawal, suspension, or count update separately.

Inspect 1 evidence item

Member States

Economic Community of West African States · reverified-original-source

Publication
not displayed
Access
2026-07-23T10:53:59Z
Language
English
Translation
No translation; source reviewed in English.
Perspective
regional
Scope
ECOWAS · regional

Support boundary: Supports only the bounded institutional observation stated here.

Independent human question: For claim-senegal-05: Does the qualification accurately capture the source limitation without understating or overstating the underlying institution, disagreement, or implementation gap?

Locally informed prompt: For a reviewer with relevant Senegal knowledge: does the wording for claim-senegal-05 match locally used institutional and public terminology for alliances and issue specific relationships; what implementation, access, disagreement, affected-community, island/region, language, or remedy evidence is missing; and may the response be quoted, summarized, or retained only privately?

Response state: not performed / not collected.

claim-senegal-06CORROBORATED
ORIGINAL 2.0.22

At the 69th Ordinary Session on 19 July 2026, ECOWAS stated that President Bassirou Diomaye Faye assumed the chair of the Authority of Heads of State and Government.

AUDIT RESULT

Original bounded statement retained.

Change: Renewed public-source access continued to support the bounded original statement at the audit cutoff; no material contradiction or supersession was located in this pass.

Rationale: The original source or a current authoritative route remained available and supported the claim within its stated institutional, geographic, and temporal scope.

Confidence: high

Resolution test: An independent reviewer should re-open the cited source, test the statement against any later correction or superseding instrument, and verify that no broader inference has been added beyond the source scope.

Inspect 1 evidence item

69th Ordinary Session of the ECOWAS Authority

Economic Community of West African States · reverified-original-source

Publication
2026-07-19
Access
2026-07-23T10:53:59Z
Language
English
Translation
No translation; source reviewed in English.
Perspective
regional
Scope
ECOWAS Authority · regional

Support boundary: Supports only the bounded institutional observation stated here.

Independent human question: For claim-senegal-06: Is the renewed source support sufficient for the exact bounded wording, and is any legally or politically material qualification missing?

Locally informed prompt: For a reviewer with relevant Senegal knowledge: does the wording for claim-senegal-06 match locally used institutional and public terminology for alliances and issue specific relationships; what implementation, access, disagreement, affected-community, island/region, language, or remedy evidence is missing; and may the response be quoted, summarized, or retained only privately?

Response state: not performed / not collected.

04

Dependencies, resilience, substitution, and affected communities

claim-senegal-07CORROBORATED
ORIGINAL 2.0.22

Senegal's budget portal publishes a 2026 citizen budget and associated multi-year and gender-budget documents, providing official fiscal baselines for review.

AUDIT RESULT

Original bounded statement retained.

Change: Renewed public-source access continued to support the bounded original statement at the audit cutoff; no material contradiction or supersession was located in this pass.

Rationale: The original source or a current authoritative route remained available and supported the claim within its stated institutional, geographic, and temporal scope.

Confidence: high

Resolution test: An independent reviewer should re-open the cited source, test the statement against any later correction or superseding instrument, and verify that no broader inference has been added beyond the source scope.

Inspect 1 evidence item

Budget publications

Government of Senegal budget portal · reverified-original-source

Publication
not displayed
Access
2026-07-23T10:53:59Z
Language
French
Translation
Official French titles reviewed with machine-assisted translation; document contents were not treated as fully reviewed where only the HTML catalogue was inspected.
Perspective
official-self-report
Scope
Budget administration · national

Support boundary: Supports document availability, not independent validation of allocations, execution, or outcomes.

Independent human question: For claim-senegal-07: Is the renewed source support sufficient for the exact bounded wording, and is any legally or politically material qualification missing?

Locally informed prompt: For a reviewer with relevant Senegal knowledge: does the wording for claim-senegal-07 match locally used institutional and public terminology for economy and infrastructure; what implementation, access, disagreement, affected-community, island/region, language, or remedy evidence is missing; and may the response be quoted, summarized, or retained only privately?

Response state: not performed / not collected.

claim-senegal-08CORROBORATED
ORIGINAL 2.0.22

The West African Power Pool lists Senegal within the regional electricity-cooperation system.

AUDIT RESULT

Original bounded statement retained.

Change: Renewed public-source access continued to support the bounded original statement at the audit cutoff; no material contradiction or supersession was located in this pass.

Rationale: The original source or a current authoritative route remained available and supported the claim within its stated institutional, geographic, and temporal scope.

Confidence: high

Resolution test: An independent reviewer should re-open the cited source, test the statement against any later correction or superseding instrument, and verify that no broader inference has been added beyond the source scope.

Inspect 1 evidence item

WAPP member countries and institutions

West African Power Pool · reverified-original-source

Publication
not displayed
Access
2026-07-23T10:53:59Z
Language
English
Translation
No translation; source reviewed in English.
Perspective
regional
Scope
West African Power Pool · regional

Support boundary: Supports only the bounded institutional observation stated here.

Independent human question: For claim-senegal-08: Is the renewed source support sufficient for the exact bounded wording, and is any legally or politically material qualification missing?

Locally informed prompt: For a reviewer with relevant Senegal knowledge: does the wording for claim-senegal-08 match locally used institutional and public terminology for economy and infrastructure; what implementation, access, disagreement, affected-community, island/region, language, or remedy evidence is missing; and may the response be quoted, summarized, or retained only privately?

Response state: not performed / not collected.

05

Evidence reliability, confidence, correction, and oversight

claim-senegal-09CORROBORATED
ORIGINAL 2.0.22

The Court of Accounts describes a constitutional and statutory mandate to audit public finances and publishes reports for public inspection.

AUDIT RESULT

Original bounded statement retained.

Change: Renewed public-source access continued to support the bounded original statement at the audit cutoff; no material contradiction or supersession was located in this pass.

Rationale: The original source or a current authoritative route remained available and supported the claim within its stated institutional, geographic, and temporal scope.

Confidence: high

Resolution test: An independent reviewer should re-open the cited source, test the statement against any later correction or superseding instrument, and verify that no broader inference has been added beyond the source scope.

Inspect 1 evidence item

Court of Accounts mandate and reports

Court of Accounts of Senegal · reverified-original-source

Publication
not displayed
Access
2026-07-23T10:53:59Z
Language
French
Translation
Official French page reviewed with machine-assisted English translation; legal conclusions were not independently validated.
Perspective
official-self-report
Scope
Court of Accounts · national

Support boundary: Supports only the bounded institutional observation stated here.

Independent human question: For claim-senegal-09: Is the renewed source support sufficient for the exact bounded wording, and is any legally or politically material qualification missing?

Locally informed prompt: For a reviewer with relevant Senegal knowledge: does the wording for claim-senegal-09 match locally used institutional and public terminology for oversight and remedy; what implementation, access, disagreement, affected-community, island/region, language, or remedy evidence is missing; and may the response be quoted, summarized, or retained only privately?

Response state: not performed / not collected.

claim-senegal-10CORROBORATED WITH QUALIFICATION
ORIGINAL 2.0.22

The Senegalese Human Rights Committee publishes a complaint route and institutional material, while this draft retains open questions about resources, independence, and implementation after its 2024 reform.

AUDIT RESULT

The Senegalese national human-rights institution publishes a complaint route and current institutional activity. This verifies a formal route, while independence, resources, geographic accessibility, response time, and implementation of recommendations remain unresolved.

Change: Update the institution description and sharpen the formal-route versus practical-remedy boundary.

Rationale: Current institutional pages show a complaint mechanism and activity, but formal availability cannot establish remedy quality or independence.

Confidence: moderate

Resolution test: Review the governing law, accreditation status, budget, staffing, complaint statistics, response times, regional access, published outcomes, and civil-society assessments after the 2024 reform.

Inspect 2 evidence items

Accueil and complaint information

Comité Sénégalais des Droits de l'Homme · reverified-original-source

Publication
not displayed
Access
2026-07-23T10:53:59Z
Language
French
Translation
Official French page reviewed with machine-assisted English translation; no certified legal translation was used.
Perspective
local
Scope
National human-rights institution · national

Support boundary: Supports the existence of a public route and institutional materials; effectiveness, accessibility, and independence require further evidence.

Accueil

Senegalese national human-rights institution · corroborates-formal-route-and-current-activity

Publication
not displayed
Access
2026-07-23T10:53:59Z
Language
French
Translation
French page reviewed with machine-assisted English translation; legal and institutional terminology requires human review.
Perspective
official-self-report
Scope
National human-rights institution · national

Support boundary: Shows a current institutional portal and complaint/activity routes; does not establish independent effectiveness.

Independent human question: For claim-senegal-10: Does the qualification accurately capture the source limitation without understating or overstating the underlying institution, disagreement, or implementation gap?

Locally informed prompt: For a reviewer with relevant Senegal knowledge: does the wording for claim-senegal-10 match locally used institutional and public terminology for oversight and remedy; what implementation, access, disagreement, affected-community, island/region, language, or remedy evidence is missing; and may the response be quoted, summarized, or retained only privately?

Response state: not performed / not collected.

06

Crisis cascades, unequal consequences, recovery, and uncertainty

claim-senegal-11CORROBORATED WITH QUALIFICATION
ORIGINAL 2.0.22

The civil-protection directorate identifies the ORSEC plan as a principal mechanism for coordinating emergency response.

AUDIT RESULT

The civil-protection directorate identifies the ORSEC plan as a formal emergency-coordination mechanism. The available public material does not by itself establish current subnational readiness, resource sufficiency, warning accessibility, response quality, or recovery outcomes.

Change: Retain formal authority while blocking any inference about field performance.

Rationale: The institutional mechanism is visible, but implementation evidence is older or incomplete.

Confidence: moderate

Resolution test: Review current ORSEC activation records, after-action reports, local-government plans, accessibility and language provisions, response times, resource inventories, and affected-community accounts from recent events.

Inspect 2 evidence items

Direction de la Protection Civile

Ministry of the Interior of Senegal · reverified-original-source

Publication
not displayed
Access
2026-07-23T10:53:59Z
Language
French
Translation
Official French page reviewed with machine-assisted English translation; operational effectiveness was not inferred.
Perspective
official-self-report
Scope
Civil Protection Directorate · national

Support boundary: Supports only the bounded institutional observation stated here.

Direction de la Protection Civile – DPC

Ministry of the Interior of Senegal · corroborates-formal-responsibility

Publication
not displayed
Access
2026-07-23T10:53:59Z
Language
French
Translation
French page reviewed with machine-assisted English translation; operational terminology requires human review.
Perspective
official-self-report
Scope
Civil protection directorate · national

Support boundary: Supports the formal civil-protection and ORSEC coordination role, not field performance.

Independent human question: For claim-senegal-11: Does the qualification accurately capture the source limitation without understating or overstating the underlying institution, disagreement, or implementation gap?

Locally informed prompt: For a reviewer with relevant Senegal knowledge: does the wording for claim-senegal-11 match locally used institutional and public terminology for environmental constraints; what implementation, access, disagreement, affected-community, island/region, language, or remedy evidence is missing; and may the response be quoted, summarized, or retained only privately?

Response state: not performed / not collected.

claim-senegal-12CORROBORATED
ORIGINAL 2.0.22

An ECOWAS consultation with refugees in Senegal recorded requests concerning education, training, health, and social protection; these are affected-community perspectives within that consultation, not a national opinion measure.

AUDIT RESULT

Original bounded statement retained.

Change: Renewed public-source access continued to support the bounded original statement at the audit cutoff; no material contradiction or supersession was located in this pass.

Rationale: The original source or a current authoritative route remained available and supported the claim within its stated institutional, geographic, and temporal scope.

Confidence: high

Resolution test: An independent reviewer should re-open the cited source, test the statement against any later correction or superseding instrument, and verify that no broader inference has been added beyond the source scope.

Inspect 1 evidence item

Consultation with refugees in Senegal

Economic Community of West African States · reverified-original-source

Publication
2026-02-05
Access
2026-07-23T10:53:59Z
Language
English
Translation
No translation; source reviewed in English.
Perspective
affected-community
Scope
ECOWAS consultation and refugee participants · subnational and affected-community

Support boundary: Supports the consultation summary and stated needs of participants; does not establish prevalence or service outcomes.

Independent human question: For claim-senegal-12: Is the renewed source support sufficient for the exact bounded wording, and is any legally or politically material qualification missing?

Locally informed prompt: For a reviewer with relevant Senegal knowledge: does the wording for claim-senegal-12 match locally used institutional and public terminology for rights and affected communities; what implementation, access, disagreement, affected-community, island/region, language, or remedy evidence is missing; and may the response be quoted, summarized, or retained only privately?

Response state: not performed / not collected.

Locally informed review workflow

Questions ready.
Answers absent.

No identity, conflict, consent, language competence, experience, permission, or claim response was fabricated.

STATUS

not-collected

No model, editor, or automated process may populate reviewer identity, consent, conflict, language competence, experience, permission, or claim-response fields. Only an actual reviewer may supply those fields, and the repository must retain the attributable or consented record.

SOURCE LANGUAGE

French

Official French-language records are necessary but do not equal broad local representation. Review should test terminology and institutional meaning in Wolof and other relevant national-language contexts where the claim affects public access or affected communities.

ATTRIBUTION + CONFLICT

Reviewer name, role, relationship, verification route, review date, conflicts, safety constraints, and handling notes are all blank.

CONSENT + SCOPE

Quote, paraphrase, attribution, anonymity, private-use, withdrawal, and correction permissions are all blank.

Append-only correction history

Never silently overwrite.

Corrections affect derivative reuse. The original draft and source records remain separately addressable.

audit-correction-senegal-02

active-correction-before-reuse

Original: The Presidency's 1 June 2026 government-composition notice identifies Ahmadou Al Aminou Lo as Prime Minister and lists the new government under decrees issued in late May and early June 2026.

Revised: Official Presidency records identify Ahmadou Alhaminou Mohamed LO as Prime Minister, appointed by decree no. 2026-1129 of 25 May 2026; the 1 June 2026 cabinet notice lists the government under decree no. 2026-1130.

Resolution test: An independent reviewer should compare the appointment decree, cabinet decree, official biography, and any official gazette rendering and adopt the exact legally published name while retaining alternate spellings as search aliases only.

audit-correction-senegal-04

active-correction-before-reuse

Original: Reuters reported on 1 June 2026 that PASTEF said it would not participate in the newly announced government; this is recorded as a party position at that date, not as a proxy for public opinion.

Revised: PASTEF leader Ousmane Sonko stated on 1 June 2026 that the party would not participate in or be represented by ministers in the new government. Reuters and Al Jazeera reported that the announced cabinet nevertheless included several people identified as PASTEF members. The statement is therefore retained only as a party position and must not be treated as a verified description of cabinet affiliation.

Resolution test: Obtain PASTEF's attributable statement, official party membership or minister affiliation records, and cabinet biographies; document whether named ministers were party members, independent appointees, suspended members, or described differently by the party at the cutoff.

Publication gate

Blocked by design.

Publishable: No

Required human work

  • Independent human second pass has not been documented.
  • Locally informed review has not been documented.
  • Reviewer attribution, conflict-of-interest disclosure, consent, and publication scope remain blank.
  • Affected-community representation is incomplete and cannot be inferred from public-source collection.
  • Human publication approval has not been documented.

Validation boundary

A passing source-audit gate establishes reviewability and traceability only; it does not establish factual correctness, legal validity, local acceptance, political or geopolitical neutrality, or publication approval.

Connected tools and standards

Explore the wider AI ecosystem.