Work in progress IARPG-OPS-2 2.0.25-wip

Global publication search

Search the operations design system

Type to search standards, missions, roles, authorities, reports, sources, pages, schemas, and UAI memory.

Africa · exact source cutoff 2026-07-23T20:01:27Z

Senegal
review status

Six volatile claims were re-opened against current public sources. The imported reviewer packet remains unanswered, all twelve adjudication slots remain unperformed, and publication is blocked.

Direct answer

What does this page establish?

It establishes a traceable source-recheck state at the recorded cutoff and a safe intake structure for real review. It does not establish independent human endorsement, locally informed acceptance, representative public opinion, consent, legal validity, political neutrality, or publication approval.

Reviewer intake
Unanswered · open JSON
Source recheck
Six claims · open JSON
Adjudication
0 of 12
Original draft
Immutable

Reviewer intake

Questions imported.
Answers absent.

No identity, qualification, relationship, language competence, conflict, funding, consent, permission, response, source, confidence, or requested wording was generated.

IDENTITY + SAFETY

Unanswered; attributable, pseudonymous, confidential, and non-public states remain available.

EXPERIENCE + RELATIONSHIP

Unanswered; no expertise or representativeness inferred.

LANGUAGE + TRANSLATION

French source environment; reviewer competence and translation remain null.

CONSENT + SCOPE

Participation, quotation, attribution, retention, anonymity, and publication permissions remain null.

06

One claim per lens

Current source state.
Human review still separate.

claim-senegal-02REMAINS CURRENT

Authority, implementation, oversight, remedy, and public legitimacy

2.0.23 AUDIT WORDING

Official Presidency records identify Ahmadou Alhaminou Mohamed LO as Prime Minister, appointed by decree no. 2026-1129 of 25 May 2026; the 1 June 2026 cabinet notice lists the government under decree no. 2026-1130.

2.0.25 CURRENT BOUNDARY

Official Presidency records identify Ahmadou Alhaminou Mohamed LO as Prime Minister, appointed by decree no. 2026-1129 of 25 May 2026; the 1 June 2026 cabinet notice lists the government under decree no. 2026-1130.

Change: The authoritative or primary route remained current at the new cutoff; the bounded wording and all prior qualifications or corrections remain in force.

Rationale: The reviewed current source continued to identify the institution, officeholder, membership, budget, oversight route, or policy record within the claim's bounded scope.

Resolution test: An independent reviewer should reopen the cited evidence, test for later correction or supersession, assess wording and implementation limits, and document any locally informed disagreement before adjudication.

Inspect 2 evidence items

Composition du nouveau Gouvernement

Presidency of the Republic of Senegal · reverified-original-source

Publication
2026-06-01
Access
2026-07-23T20:01:27Z
Language
French
Translation
Official French page reviewed with machine-assisted English translation; names, decree numbers, and dates retained verbatim; locally informed review pending.
Scope
Presidency and government · national

Support boundary: Supports only the bounded institutional observation stated here.

Profil du nouveau Premier Ministre de la République du Sénégal

Presidency of the Republic of Senegal · corrects-name-and-corroborates-office

Publication
2026-05-25
Access
2026-07-23T20:01:27Z
Language
French
Translation
Official French page reviewed with machine-assisted English translation; names, dates, and decree references retained verbatim; human French-language review pending.
Scope
Presidency and Prime Minister · national

Support boundary: Directly identifies Ahmadou Alhaminou Mohamed LO and states that he was appointed Prime Minister.

claim-senegal-04NEEDS QUALIFICATION

Domestic coalitions, disagreement, continuity, and change

2.0.23 AUDIT WORDING

PASTEF leader Ousmane Sonko stated on 1 June 2026 that the party would not participate in or be represented by ministers in the new government. Reuters and Al Jazeera reported that the announced cabinet nevertheless included several people identified as PASTEF members. The statement is therefore retained only as a party position and must not be treated as a verified description of cabinet affiliation.

2.0.25 CURRENT BOUNDARY

PASTEF's stated cabinet non-participation remains attributable as a party position, while contemporaneous reporting about ministers identified as affiliated with PASTEF remains a material qualification. The record must preserve both and must not infer cabinet affiliation, party discipline, or public opinion beyond the cited evidence.

Change: The 2.0.23 correction remains active; the new pass retains the disagreement rather than resolving party affiliation by inference.

Rationale: No later authoritative record located in this bounded pass removed the distinction between a party statement and reported affiliations.

Resolution test: Obtain attributable party membership records, cabinet biographies, and any later correction or disciplinary record; submit them to independent and locally informed reviewers before adjudication.

Inspect 4 evidence items

Senegal ruling party stays out of new government

Reuters · reverified-original-source

Publication
2026-06-01
Access
2026-07-23T20:01:27Z
Language
English
Translation
No translation; source reviewed in English.
Scope
Political party and executive · national

Support boundary: Supports a reported party position at the cutoff; does not establish motives, durable coalition structure, or population-wide opinion.

Senegal's Sonko pulls his party from new government, raising risk to IMF deal

Reuters · qualifies-and-identifies-discrepancy

Publication
2026-06-01
Access
2026-07-23T20:01:27Z
Language
English
Translation
No translation for the article; quoted French-language political statement remains mediated by the publisher's translation and requires original-statement review.
Scope
Political party and cabinet · national

Support boundary: Reports the party non-participation statement and separately reports that the cabinet included at least three people identified as PASTEF members.

Sénégal : PASTEF claque la porte et refuse toute participation au gouvernement

Ledjely.com · corroborates-party-position

Publication
2026-06-01
Access
2026-07-23T20:01:27Z
Language
French
Translation
French source reviewed with machine-assisted English translation; quoted wording retained in the source language for later human review.
Scope
Political party · Senegal and West African regional readership

Support boundary: Reports the party's stated refusal to participate or be represented in the new government.

Senegal president names government, boycotted by ally-turned-rival

Al Jazeera · qualifies-party-position

Publication
2026-06-02
Access
2026-07-23T20:01:27Z
Language
English
Translation
No translation for the article; underlying political statements remain publisher-mediated.
Scope
Political party and cabinet · national

Support boundary: Reports both the party position and the presence of several people identified as PASTEF members in the cabinet.

claim-senegal-06REMAINS CURRENT

Regional organizations, memberships, and agency

2.0.23 AUDIT WORDING

At the 69th Ordinary Session on 19 July 2026, ECOWAS stated that President Bassirou Diomaye Faye assumed the chair of the Authority of Heads of State and Government.

2.0.25 CURRENT BOUNDARY

At the 69th Ordinary Session on 19 July 2026, ECOWAS stated that President Bassirou Diomaye Faye assumed the chair of the Authority of Heads of State and Government.

Change: The authoritative or primary route remained current at the new cutoff; the bounded wording and all prior qualifications or corrections remain in force.

Rationale: The reviewed current source continued to identify the institution, officeholder, membership, budget, oversight route, or policy record within the claim's bounded scope.

Resolution test: An independent reviewer should reopen the cited evidence, test for later correction or supersession, assess wording and implementation limits, and document any locally informed disagreement before adjudication.

Inspect 1 evidence item

69th Ordinary Session of the ECOWAS Authority

Economic Community of West African States · reverified-original-source

Publication
2026-07-19
Access
2026-07-23T20:01:27Z
Language
English
Translation
No translation; source reviewed in English.
Scope
ECOWAS Authority · regional

Support boundary: Supports only the bounded institutional observation stated here.

claim-senegal-07REMAINS CURRENT

Dependencies, resilience, substitution, and affected communities

2.0.23 AUDIT WORDING

Senegal's budget portal publishes a 2026 citizen budget and associated multi-year and gender-budget documents, providing official fiscal baselines for review.

2.0.25 CURRENT BOUNDARY

Senegal's budget portal publishes a 2026 citizen budget and associated multi-year and gender-budget documents, providing official fiscal baselines for review.

Change: The authoritative or primary route remained current at the new cutoff; the bounded wording and all prior qualifications or corrections remain in force.

Rationale: The reviewed current source continued to identify the institution, officeholder, membership, budget, oversight route, or policy record within the claim's bounded scope.

Resolution test: An independent reviewer should reopen the cited evidence, test for later correction or supersession, assess wording and implementation limits, and document any locally informed disagreement before adjudication.

Inspect 1 evidence item

Budget publications

Government of Senegal budget portal · reverified-original-source

Publication
not displayed
Access
2026-07-23T20:01:27Z
Language
French
Translation
Official French titles reviewed with machine-assisted translation; document contents were not treated as fully reviewed where only the HTML catalogue was inspected.
Scope
Budget administration · national

Support boundary: Supports document availability, not independent validation of allocations, execution, or outcomes.

claim-senegal-10NEEDS QUALIFICATION

Evidence reliability, disagreement, correction, and oversight

2.0.23 AUDIT WORDING

The Senegalese national human-rights institution publishes a complaint route and current institutional activity. This verifies a formal route, while independence, resources, geographic accessibility, response time, and implementation of recommendations remain unresolved.

2.0.25 CURRENT BOUNDARY

The Senegalese national human-rights institution publishes a complaint route and current institutional activity. This verifies a formal route, while independence, resources, geographic accessibility, response time, and implementation of recommendations remain unresolved.

Change: The core institutional observation remains supported, but implementation, access, disagreement, periodization, scope, or outcome limits must remain explicit.

Rationale: Formal publication does not by itself prove implementation, practical authority, equal access, outcomes, community acceptance, or population-wide opinion.

Resolution test: An independent reviewer should reopen the cited evidence, test for later correction or supersession, assess wording and implementation limits, and document any locally informed disagreement before adjudication.

Inspect 2 evidence items

Accueil and complaint information

Comité Sénégalais des Droits de l'Homme · reverified-original-source

Publication
not displayed
Access
2026-07-23T20:01:27Z
Language
French
Translation
Official French page reviewed with machine-assisted English translation; no certified legal translation was used.
Scope
National human-rights institution · national

Support boundary: Supports the existence of a public route and institutional materials; effectiveness, accessibility, and independence require further evidence.

Accueil

Senegalese national human-rights institution · corroborates-formal-route-and-current-activity

Publication
not displayed
Access
2026-07-23T20:01:27Z
Language
French
Translation
French page reviewed with machine-assisted English translation; legal and institutional terminology requires human review.
Scope
National human-rights institution · national

Support boundary: Shows a current institutional portal and complaint/activity routes; does not establish independent effectiveness.

claim-senegal-11NEEDS QUALIFICATION

Crisis cascades, unequal consequences, recovery, and uncertainty

2.0.23 AUDIT WORDING

The civil-protection directorate identifies the ORSEC plan as a formal emergency-coordination mechanism. The available public material does not by itself establish current subnational readiness, resource sufficiency, warning accessibility, response quality, or recovery outcomes.

2.0.25 CURRENT BOUNDARY

The civil-protection directorate identifies the ORSEC plan as a formal emergency-coordination mechanism. The available public material does not by itself establish current subnational readiness, resource sufficiency, warning accessibility, response quality, or recovery outcomes.

Change: The core institutional observation remains supported, but implementation, access, disagreement, periodization, scope, or outcome limits must remain explicit.

Rationale: Formal publication does not by itself prove implementation, practical authority, equal access, outcomes, community acceptance, or population-wide opinion.

Resolution test: An independent reviewer should reopen the cited evidence, test for later correction or supersession, assess wording and implementation limits, and document any locally informed disagreement before adjudication.

Inspect 2 evidence items

Direction de la Protection Civile

Ministry of the Interior of Senegal · reverified-original-source

Publication
not displayed
Access
2026-07-23T20:01:27Z
Language
French
Translation
Official French page reviewed with machine-assisted English translation; operational effectiveness was not inferred.
Scope
Civil Protection Directorate · national

Support boundary: Supports only the bounded institutional observation stated here.

Direction de la Protection Civile – DPC

Ministry of the Interior of Senegal · corroborates-formal-responsibility

Publication
not displayed
Access
2026-07-23T20:01:27Z
Language
French
Translation
French page reviewed with machine-assisted English translation; operational terminology requires human review.
Scope
Civil protection directorate · national

Support boundary: Supports the formal civil-protection and ORSEC coordination role, not field performance.

Claim-level adjudication

Twelve slots.
Zero decisions.

Every slot records a separate editor, decision, rationale, evidence considered, publication effect, and appeal route when real adjudication occurs.

REGISTER

12 claim slots

COMPLETED

0

DECISION STATE

Not performed

PUBLICATION EFFECT

Blocked

Publication gate

Blocked by design.

Publishable: No

Missing evidence

  • Independent human review has not been supplied or verified.
  • Locally informed or affected-community review has not been supplied or verified.
  • Reviewer identity or consented anonymity choice, qualifications, local relationship, language competence, conflict disclosure, and funding disclosure remain unanswered.
  • Consent to participate, quote, attribute, retain, and publish remains unanswered.
  • Claim-level reviewer responses and editorial adjudication remain absent.
  • One reviewer or one community account could not establish representative public opinion or jurisdiction-wide acceptance even if later supplied.

Boundary

A source recheck can establish traceable current support or supersession at the cutoff; it cannot establish human endorsement, local acceptance, representative public opinion, legal validity, political neutrality, or publication approval.

Connected tools and standards

Explore the wider AI ecosystem.